Depot charging calculator
Pick the electric vehicles you’re planning, from vans to prime movers, and see if your depot’s power supply can charge them overnight. Then compare load management, a bigger supply, and solar with a battery.
Your fleet
One row for each vehicle model. Energy use and charging limits come from each vehicle’s EVdex page.
Your depot today
Try a change
Your depot over 24 hours
Noon to noon, so the overnight charge reads as one block. The dashed line is your supply limit.
Options side by side
The same fleet against the usual ways to power it.
Estimates only. We assume a typical site load shape, Sydney sunshine, 10% charging losses and supply at 0.95 power factor with 10% held back. Network approvals for a bigger supply or substation can take 6 to 12 months.
Want this checked for your depot?
A free 30-minute consult is the place to start. A feasibility study (from $1,000) replaces these assumptions with your interval data, switchboard and routes.
Book a free fleet consultQuestions
Where do the energy figures come from?
From each vehicle’s page on EVdex: its battery, its tested energy use and its AC and DC charging limits. We adjust energy use for the load you pick and for mixed driving. Vehicles without full test data use a rougher estimate.
Why does my charger show a lower kW?
Each vehicle can only take so much power. A van that accepts 11 kW AC won’t charge faster on a 22 kW charger, so we use the lower of the two.
What is load management?
Software that shares your site’s spare power between chargers so the depot never goes over its supply. Every vehicle still gets its charge, spread across the hours it’s parked.
How is the battery sized?
As a 4-hour battery, so a 1,000 kWh battery delivers up to 250 kW. It charges from solar and spare grid power, and covers the hours when charging would push the site over its supply.
Is this enough to order equipment?
No. It’s a first pass using typical site load and Sydney sunshine. A feasibility study (from $1,000) uses your interval data, switchboard and routes, and is what grant applications and network upgrades need.